Sahel Arshia khavarmianeh

Phase 15&16

Perform mechanical operations from the refinery to the shore (landfall point)

NIOEC

Gachsaran

Development plan for 1200 Ton Gachsaran Refinery desalination unit

IOEC

South pars field

Providing specialized manpower to install the decks (Topside) of phases 6, 7 and 8 of South Pars gas field

Rahgoshayan Darya

4 district regions of IOOC

Design and construction of steel structures and 8- & 16-inch pipes for the implementation of fiber optic network for offshore structures

Persian Offshore

South pars field

Manufacturing and design offshore structural pieces to support the main structure to lay the fiber optic operation (siphone)

Petrobrasan International Company

Bahregansar oil filed

Riser installation and piping of Bahregansar platform

Sahel Arshia khavarmianeh

South pars Phase 9&10

32-Inch Pipe laying reciprocal operation between phase 9&10

IOEC

Khoramshahr

Repair of Barge-118

IOEC

Asalouyeh

Pipeline Shore pulling operation phase 15-16 of south pars

TASDID

Soroush oil field

Installation of additional deck to the Soroush platform

Petroabresan international company

Balal oil field

Boat landing and barge bumper repair of Balal platform

Petroabresan international company

Hindijan

Implementation of Piping System of WHP07 platform in Hindijan

Petroabresan international company

Soroush oil field

Flexible Riser installation between subsea PLEM to the Persian Gulf super Tanker

Sahel Arshia khavarmianeh

Phase 15& 16

Piping system operation, Manufacturing and installation of carbon steel pipe, installation of all supports, all valves and flange pieces

Petroabresan international company

Soroush oil field

Piping system operation, installation of carbon steel pipe and painting operation of C9 platform in the Soroush oil field

Petroabresan international company

Soroush oil field

Piping system operation of SWP2 in the Soroush oil field

Sahel Arshia khavarmianeh

Phase 17&18

Perform mechanical operations from the refinery to the shore (landfall point)

TASDID

Reshadat

construction of steel pieces for Reshadat platform

TASDID

Sourosh

Completion of remaining operations for cellar and main deck of sourosh platform

TASDID

Reshadat

Construction of platforms legs and conductor pipes for the development of Reshadat field

TASDID

Reshadat

Completion of punch removing Reshadat platform W4

TASDID

Reshadat

Piping Execution and testing of Reshadat field and early production line (EPC)

IOOC

Salman oil field

installation of 30-inches valves

IOOC

Salman oil field

rehabilitation and reforming of pipe lines welding of KPP Platform

Alfa Darya

Salman oil field

Engineering, construction, installation of spools and pipeline pre-commissioning of Salman platform S1

DOT

Salman oil field

Providing expert manpower for installation of topside(decks) of Salman platform

IOEC

South pars field

Providing expert manpower for topside(decks) installation of phase 9 and 10 of south pars field

IOEC

Khoramshahr

Installation of DAVIT bases on Abuzar-81 barge and its preparation for transferring marine structures (bases and decks) to the sea

IOEC

Bahregansar Oil field

Construction, installation and load out of 2500-ton offshore structures, Grillage and Sea Fastening of Bahregansar project.

Tasdid

Abadan-Ahvaz Road

Execution of Mechanical section of 16-inch Abadan-Ahwaz pipeline with a length of 75 km, including pipe transport, yarn, bending, welding, sandblasting, welding of pipes, insulation work and laying inside the canal.

KITO

Lengeh port

Lubrication and commissioning of Sheave Block and Fairleads as well as overhaul of generators and crane accessories on the Annet barge

IOEC

Khoramshahr

Repair of damaged tanks on Abuzar-81 barge includes executive repairs of 10 structural components, scaffolding and application of 2 layers of paint, NDT, Sand Blast and painting operations

Rahgoshayan darya

Doroud oil field

Construction of structural components for underwater repair of eight offshore structures in Dorod and Forouzan oil field.

IOEC

Siri island

Sand Blast and underwater and above water painting of Siri Island oil export wharf

IOEC

Bahregansar Oil field

Providing Technical manpower for installation of offshore structures at Bahregansar oil field

IOEC

Khoramshahr

Repair of damaged components of Danial-2 barge

Rahgoshayan darya

Isfahan

Pre-Manufacturing and installation of components related to SPIFON South Pars decks for fiber optic subsea cable laying project

IOEC

Khoramshahr

separation of damaged HING (Rocker Arm) and manufacturing and installation of a new HING on Abuzar-110 barge

IOEC

Khoramshahr

Installation of two SKAGIT winch machines with a capacity of 80 tons on Abuzar-81 barge

DOT

Bahregansar

Providing expert manpower for installation of topside(decks) of Bahregansar platform