Perform mechanical operations from the refinery to the shore (landfall point)
Development plan for 1200 Ton Gachsaran Refinery desalination unit
Providing specialized manpower to install the decks (Topside) of phases 6, 7 and 8 of South Pars gas field
Design and construction of steel structures and 8- & 16-inch pipes for the implementation of fiber optic network for offshore structures
Manufacturing and design offshore structural pieces to support the main structure to lay the fiber optic operation (siphone)
Riser installation and piping of Bahregansar platform
32-Inch Pipe laying reciprocal operation between phase 9&10
Repair of Barge-118
Pipeline Shore pulling operation phase 15-16 of south pars
Installation of additional deck to the Soroush platform
Boat landing and barge bumper repair of Balal platform
Implementation of Piping System of WHP07 platform in Hindijan
Flexible Riser installation between subsea PLEM to the Persian Gulf super Tanker
Piping system operation, Manufacturing and installation of carbon steel pipe, installation of all supports, all valves and flange pieces
Piping system operation, installation of carbon steel pipe and painting operation of C9 platform in the Soroush oil field
Piping system operation of SWP2 in the Soroush oil field
Perform mechanical operations from the refinery to the shore (landfall point)
construction of steel pieces for Reshadat platform
Completion of remaining operations for cellar and main deck of sourosh platform
Construction of platforms legs and conductor pipes for the development of Reshadat field
Completion of punch removing Reshadat platform W4
Piping Execution and testing of Reshadat field and early production line (EPC)
installation of 30-inches valves
rehabilitation and reforming of pipe lines welding of KPP Platform
Engineering, construction, installation of spools and pipeline pre-commissioning of Salman platform S1
Providing expert manpower for installation of topside(decks) of Salman platform
Providing expert manpower for topside(decks) installation of phase 9 and 10 of south pars field
Installation of DAVIT bases on Abuzar-81 barge and its preparation for transferring marine structures (bases and decks) to the sea
Construction, installation and load out of 2500-ton offshore structures, Grillage and Sea Fastening of Bahregansar project.
Execution of Mechanical section of 16-inch Abadan-Ahwaz pipeline with a length of 75 km, including pipe transport, yarn, bending, welding, sandblasting, welding of pipes, insulation work and laying inside the canal.
Lubrication and commissioning of Sheave Block and Fairleads as well as overhaul of generators and crane accessories on the Annet barge
Repair of damaged tanks on Abuzar-81 barge includes executive repairs of 10 structural components, scaffolding and application of 2 layers of paint, NDT, Sand Blast and painting operations
Construction of structural components for underwater repair of eight offshore structures in Dorod and Forouzan oil field.
Sand Blast and underwater and above water painting of Siri Island oil export wharf
Providing Technical manpower for installation of offshore structures at Bahregansar oil field
Repair of damaged components of Danial-2 barge
Pre-Manufacturing and installation of components related to SPIFON South Pars decks for fiber optic subsea cable laying project
separation of damaged HING (Rocker Arm) and manufacturing and installation of a new HING on Abuzar-110 barge
Installation of two SKAGIT winch machines with a capacity of 80 tons on Abuzar-81 barge
Providing expert manpower for installation of topside(decks) of Bahregansar platform